Automation Asia AssociatesComplete Fire Protection Solutions Since 1989 Free compliance check

Thirteen systems, and the approvals that go with them

Active fire fighting systems and passive fire protection on one contract, to the NBC and local fire rules — and the Site and Final NOC carried through to clearance rather than handed back to you as a file.

The schedule

Ten active systems and three passive. Most contractors carry the active list and stop there; compartmentation is then split across trades and nobody owns it at the Final NOC inspection. Here it is one scope and one contractor.

Choose a system to see where it sits in the building.

  1. Active systems 10
  2. Passive protection 3

Installed, not illustrated

Our own site photographs, not stock.

Fire duct with red glazed doors, hose reel, landing valve, extinguisher and hose cabinet
Fire duct door Hose reel & landing valve
Wet riser alarm valve set
Wet riser manifold Alarm valve set
Fire pump room with diesel engine pump, electric pumps and red header pipework
Fire pump room Diesel & electric pumps

See the buildings these went into

Two certificates, two different risks

They are often spoken about as one thing. They are not — and the second one is what stops your handover.

Site NOC Granted against drawings

Issued before or during construction. It says the design satisfies the authority. Getting it rests on the design — the right drawings and calculations, submitted in the form the authority expects.

The risk here isDesign & documentation
Final NOC Granted against what was built

Issued on physical inspection, and the building can't be occupied until it's granted. Once the Site NOC is in hand, every remaining risk is installation risk — and installation risk belongs to the contractor.

The risk here isInstallation

Where projects fail

A system installed to a drawing the authority never approved. Compartmentation broken by a door or a penetration nobody owned. Commissioning records that do not match the as-built. All of it surfaces at the Final NOC inspection — when the building is finished and the client is waiting.

What we take on

The approvals as part of scope rather than as a variation — both certificates when we carry the design, or the Final NOC when your consultant has secured the Site NOC. The drawings, the submission, the queries and any re-inspection, coordinated with your consultant throughout.

Five stages, one contract

The order mirrors how a real project runs — advisory, then drawings, then installation, then statutory approvals, then the maintenance that keeps the clearance valid.

  1. ConsultancyOccupancy review, hazard classification, fire safety audits with a written report, budget scope
  2. DesignHydraulic calculations, GA and shop drawings to the NBC and the state’s building rules
  3. InstallationSupply, erection, testing and commissioning
  4. Statutory ApprovalsSite NOC and Final NOC — prepared, submitted, followed up. Step by step →Needed before occupancy
  5. AMCScheduled maintenance for commercial, industrial, hotel and hospital premises

Working with your MEP consultantAlready working with an MEP consultant? We can join at installation, build to their approved design, and work as a partner to them and to you. Nothing is changed on site without their approval and yours.

Questions we are asked

What is the difference between a Site NOC and a Final NOC?

The Site NOC (also called the Initial NOC) is granted against drawings, before or during construction: it says the design satisfies the fire authority. The Final NOC is granted on physical inspection of what was built, and the building cannot be occupied until it is granted. The whole process, step by step: How to get a fire NOC for a building in Kerala.

Do you handle the fire NOC applications?

Yes, as part of our scope rather than as a variation: both certificates when we carry the design, or the Final NOC when your consultant has secured the Site NOC. That covers the drawings, the submission, the queries and any re-inspection.

Which fire protection systems do you install?

Thirteen, on one contract. Ten active systems: fire hydrants and pump rooms, sprinklers, water spray, wet risers and landing valves, fire alarm and detection, CO₂ flooding, gas detection, foam monitors, public address (voice evacuation) and CCTV. Three passive ones: fire doors, smoke curtains and fire guards. We also supply and refill fire extinguishers.

Which standards do you work to?

We design, install and maintain fire protection systems to the National Building Code of India (NBC) and the building and fire rules of the state the building is in: in Kerala, the Kerala Municipality Building Rules (KMBR), the Kerala Panchayat Building Rules (KPBR) and the Kerala Fire and Rescue Services rules. We are ISO 9001:2015 certified and a registered Kerala PWD contractor, Category Electrical-Firefighting-B.

Which rules apply to a building in Kerala?

In Kerala, fire safety follows the NBC together with KMBR for buildings in municipalities and corporations, or KPBR in panchayat areas. The fire NOC itself is issued by the Kerala Fire and Rescue Services under their rules. We prepare the drawings and applications to all of them.

Do you do fire safety audits?

Yes. We inspect the building’s fire protection systems and approvals and give you a written report of what is in order and what needs work, so you know where you stand before an inspection or a renewal. For a first look, start with the free 15-minute compliance check.

Do you maintain systems after handover?

Yes. Our annual maintenance contracts (AMC) give scheduled maintenance for commercial, industrial, hotel and hospital premises, and keep the systems and their records ready for a renewal inspection.

Where do you work?

From our office in Thiruvananthapuram, across Kerala and 10+ states of India: 400+ projects since 1989.

What is the free compliance check?

Fifteen minutes on the phone, or a walk-through at your site anywhere in Kerala, on where it stands for hydrants, sprinklers, alarms and NOC status, before an inspection fails or a renewal falls due. No cost, no obligation.

Not sure where your building stands today?

Free compliance check
WhatsApp Call us